E&P Capability – Full speed ahead on Wessex Route
E&P Capability – Full speed ahead on Wessex Route
Such has been the success of the integration of Electrification and Plant (E&P) activities under the collaborative umbrella ...
M25 Digital Twin – 3D visualisation using Drones
M25 Digital Twin – 3D visualisation using Drones
“It’s encouraging to see that the UK is not just leading in Artificial Intelligence research, but also increasingly in ...
Social Value – STEM – creating the next generation of engineers
Social Value – STEM – creating the next generation of engineers
“It was really fun and interesting. We also work in groups which helps our teamwork and friendship. We get to ...
Rail Embankment Failures – Four Schemes in One Blockade
Rail Embankment Failures – Four Schemes in One Blockade
“Thank you for your hard work in delivering this complex job at short notice, going from no scope to a ...
A500 Etruria Widening – Open three months early
A500 Etruria Widening – Open three months early
Network open three months early £758k saved on piling method 600 lorry movements saved 100% waste reused or recycled
New River Bridge – Collaborative Solution
New River Bridge – Collaborative Solution
“When we started on this journey, we knew that Osborne were a company that Hertfordshire County Council could trust and ...
Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
Nazeing Road Bridge – Integrating the Technical Solution with Stakeholder Needs
UK bridges built by the Victorian’s were not designed with maintenance in mind unlike today’s CDM compliant structures. ...
LUL Step Free Access – Design differently to deliver on time
LUL Step Free Access – Design differently to deliver on time
A different design approach helps deliver ‘step free’ access for a tranche of London Underground stations. Supporting the Mayor of ...
Godalming Station – ‘Access for All’ solution opens 4 weeks early
Godalming Station – ‘Access for All’ solution opens 4 weeks early
Everyone has the right to safely access our rail transport network. To make it possible there has to be an ...
Feltham Station – Step free access compliments platform extension
Feltham Station – Step free access compliments platform extension
Smart design at Feltham safely delivers step free access and closure of a dangerous level crossing. A project completed as ...
Ashmead Embankment – Rapid response critical to maintain service
Ashmead Embankment – Rapid response critical to maintain service
At Ashmead, near Basingstoke on the route to London, prolonged wet weather led to rail embankment failure. Network Rail restricted ...
Sustainable Parking at Uxbridge College
Sustainable Parking at Uxbridge College
Design/architecture & construction The car park at Uxbridge & Harrow College was designed and installed to provide additional land ...